Skip to main contentYard report Oct 12Now open on Queen Ave. Bark dust, rock and sod in the bays.Follow for updates

Every layer, one yard.

From the bark on top to the rock underneath. Tap a material to see it up close and work out how much you need.

On topSoil & compostUnderneath

River rock in a concrete-block bay at Green Yard

Let's get your yard done.

20 × 10 ft bed, 3″ deep, in section. Each square above is one cubic yard.
1.9cubic yardsabout one full-size pickup load
Full-size pickup
0.6 loads
Wheelbarrows
9 trips
Area
200 sq ft

Rounded up, never down. The yard checks the numbers with you before anything is loaded.

Build your yard.

Pick the material, set the size and the depth, and see exactly how much to haul.

Material
On top
Soil & compost
Underneath
ft
ft